With a total investment of 1.3 billion yuan, the center has a 37,000-square-meter area for education that can accommodate 1,300 students, including a general training building, simulator training building, skills training center, human-error prevention training center, and refueling operation training center.
Principle simulator—multi-functional simulator—full scope simulator—post-accident analysis simulator—severe accident simulator
Static mechanical equipment—dynamic mechanical equipment—I&C equipment—electrical equipment—PMC(1:1) the only nuclear fuel refueling operating equipment in China.
Copyright © 2016 China General Nuclear Power Corporation all rights reserved.